What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £15.88 |
| 2 | Keadby-2 Main | £15.82 |
| 3 | Immingham CHP | £14.09 |
| 4 | Tye Lane | £12.73 |
| 5 | Swangate | £12.00 |
| 6 | Lakeside | £11.93 |
| 7 | SUNDON | £11.69 |
| Region | £/MWh |
|---|---|
| Eastern | £12.1 |
| Yorkshire | £11.9 |
| Midlands | £11.2 |
| North Western | £9.6 |