What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
| Region | £/MWh |
|---|---|
| Southern | £18.5 |
| South Scotland | £17.4 |
| South Eastern | £17.3 |
| North Scotland | £16.9 |
| Northern | £16.5 |
| Eastern | £16.4 |