What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £251.85 |
| 2 | Marchwood | £233.03 |
| 3 | Carrington Ltd - 2 | £231.39 |
| 4 | Peterhead Block 1 | £227.27 |
| 5 | Pillswood 2 | £220.69 |
| 6 | Pillswood 1 | £212.77 |
| 7 | Wormald Green | £188.61 |