What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | HawkersHill | £14.82 |
| 2 | ECOTRICITY C05L | £8.18 |
| 3 | Pen y Cymoedd | £6.90 |
| 4 | Pillswood 1 | £6.00 |
| 5 | Limejump Energy #04 | £5.33 |
| 6 | Holes Bay | £4.43 |
| 7 | SOUTH HUMBER BANK P/S | £4.31 |
| Region | £/MWh |
|---|---|
| Southern | £11.8 |
| South Wales | £6.9 |
| Yorkshire | £6.0 |