What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 1 | £26.05 |
| 2 | SOUTH HUMBER BANK P/S | £23.86 |
| 3 | Keadby-2 Main | £23.64 |
| 4 | Coryton | £23.38 |
| 5 | Rocksavage | £23.08 |
| 6 | Cottam Development Centre | £23.00 |
| 7 | Spalding | £22.32 |
| Region | £/MWh |
|---|---|
| Eastern | £21.7 |
| North Western | £20.6 |
| Southern | £20.5 |
| South Eastern | £20.5 |
| Midlands | £20.3 |
| Northern | £19.8 |
| South Wales | £18.8 |