What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £32.63 |
| 2 | Spalding | £29.86 |
| 3 | Cottam Development Centre | £26.00 |
| 4 | Coryton | £25.98 |
| 5 | Rocksavage | £25.33 |
| 6 | Keadby-2 Main | £25.33 |
| 7 | SSE Energy Supply #01 | £18.57 |
| Region | £/MWh |
|---|---|
| Northern | £18.4 |
| South Wales | £18.0 |
| Eastern | £17.3 |
| Yorkshire | £14.6 |
| South Western | £11.4 |