What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SSE Energy Supply #01 | £18.82 |
| 2 | Staythorpe 2 | £9.46 |
| 3 | Lakeside | £8.00 |
| 4 | Bloxwich | £3.69 |
| 5 | F & S Energy #02 | £3.66 |
| 6 | EDFE Aggregate N Scot 1 | £3.41 |
| 7 | Hawthorn Pit | £3.00 |
| Region | £/MWh |
|---|---|
| Midlands | £3.7 |
| Northern | £3.0 |
| Yorkshire | £2.6 |
| South Wales | £2.3 |
| Eastern | £2.0 |