What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £20.15 |
| 2 | Pen y Cymoedd | £18.85 |
| 3 | Unit 3 | £18.12 |
| 4 | Lakeside | £17.56 |
| 5 | Centrica Business Solutions S06B | £17.34 |
| 6 | Port of Tyne | £17.00 |
| 7 | Coryton | £16.88 |
| Region | £/MWh |
|---|---|
| Midlands | £20.2 |
| South Wales | £18.8 |
| Yorkshire | £16.5 |
| Northern | £16.2 |
| North Western | £15.8 |