What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Broadditch | £145.08 |
| 2 | Bloxwich | £120.45 |
| 3 | Pen y Cymoedd | £94.77 |
| 4 | Unit 3 | £94.72 |
| Region | £/MWh |
|---|---|
| South Eastern | £145.1 |
| Midlands | £120.4 |
| South Wales | £94.8 |