What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £38.13 |
| 2 | EDFE Aggregate N Scot 1 | £33.54 |
| 3 | Chapel Farm | £29.39 |
| 4 | Jamesfield 2 | £29.39 |
| 5 | Thame Road | £29.39 |
| 6 | ClayTye Farm 2 | £29.39 |
| 7 | SOUTH HUMBER BANK P/S | £29.17 |
| Region | £/MWh |
|---|---|
| North Scotland | £29.4 |
| Eastern | £29.4 |
| Yorkshire | £28.3 |