What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Statkraft Markets #08 | £45.24 |
| 2 | Larks Green | £41.54 |
| 3 | Pivot Coventry | £41.41 |
| 4 | Thame Road | £40.73 |
| 5 | Chapel Farm | £40.73 |
| 6 | ClayTye Farm 2 | £40.72 |
| 7 | Broadditch | £40.67 |
| Region | £/MWh |
|---|---|
| South Western | £41.5 |
| Midlands | £41.4 |
| Eastern | £40.7 |
| Southern | £40.4 |
| South Eastern | £24.3 |