What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £12.97 |
| 2 | Unit 1 | £12.73 |
| 3 | Carrington Ltd - 1 | £5.78 |
| 4 | Tollgate | £5.52 |
| 5 | Pillswood 1 | £5.17 |