What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £23.40 |
| 2 | Grain | £16.00 |
| 3 | Wishaw | £12.98 |
| 4 | UKPR S East | £12.88 |
| 5 | Chapel Farm | £12.56 |
| 6 | Hunningley Stairfoot | £12.18 |
| 7 | Port of Tyne | £12.00 |
| Region | £/MWh |
|---|---|
| South Scotland | £13.0 |
| Eastern | £12.6 |
| Northern | £12.0 |
| Midlands | £11.8 |
| Yorkshire | £11.6 |
| South Western | £11.4 |
| South Eastern | £8.3 |