What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £57.21 |
| 2 | Seabank Module | £53.33 |
| 3 | Kings Lynn A | £47.25 |
| 4 | Statkraft Markets #08 | £40.77 |
| 5 | Wormald Green | £38.16 |
| 6 | Hawthorn Pit | £38.11 |
| 7 | Clachan G1 | £34.21 |
| Region | £/MWh |
|---|---|
| Northern | £38.1 |
| Eastern | £31.7 |
| Southern | £29.5 |
| South Eastern | £26.0 |
| North Western | £22.8 |