What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £24.16 |
| 2 | Pembroke 21 | £19.75 |
| 3 | Unit 1 | £19.16 |
| 4 | Dollymans | £17.33 |
| 5 | Kings Lynn A | £11.55 |
| 6 | Great Yarmouth | £11.55 |
| 7 | Didcot B main 6 | £10.00 |
| Region | £/MWh |
|---|---|
| Eastern | £17.3 |