What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £38.24 |
| 2 | Unit 1 | £33.25 |
| 3 | Dollymans | £28.10 |
| 4 | Statkraft Markets #08 | £26.53 |
| 5 | Kings Lynn A | £25.62 |
| 6 | Didcot B main 6 | £24.12 |
| 7 | Centrica Business Solutions S06B | £22.68 |
| Region | £/MWh |
|---|---|
| Eastern | £28.1 |
| Midlands | £20.5 |
| South Wales | £18.1 |