What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £18.20 |
| 2 | Immingham CHP | £14.32 |
| 3 | Dollymans | £13.26 |
| 4 | Unit 1 | £11.73 |
| 5 | Lakeside | £10.56 |
| 6 | Errochty G1 | £9.14 |
| 7 | Errochty G2 | £9.14 |
| Region | £/MWh |
|---|---|
| Eastern | £13.3 |
| Yorkshire | £10.6 |
| South Eastern | £3.9 |