What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Wormald Green | £14.29 |
| 2 | UKPR MANW | £11.30 |
| 3 | HawkersHill | £11.05 |
| 4 | Unit 1 | £10.53 |
| 5 | Drax | £9.52 |
| 6 | Keadby-2 Main | £9.43 |
| 7 | BGI Trading #01 | £9.00 |
| Region | £/MWh |
|---|---|
| Northern | £14.3 |
| Southern | £11.1 |
| North Western | £8.5 |