What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 1 | £9.83 |
| 2 | Limejump Energy #04 | £9.63 |
| 3 | Limejump Energy #03 | £8.94 |
| 4 | Richborough Park 1 | £8.83 |
| 5 | Richborough Park 2 | £8.50 |
| 6 | Keadby-2 Main | £8.46 |
| 7 | Immingham CHP | £7.64 |
| Region | £/MWh |
|---|---|
| South Eastern | £8.7 |
| South Wales | £6.3 |