What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £47.78 |
| 2 | Dollymans | £34.69 |
| 3 | SSE Energy Supply #01 | £29.91 |
| 4 | Rocksavage | £27.31 |
| 5 | Centrica Business Solutions S05L | £25.91 |
| 6 | Thame Road | £24.18 |
| 7 | Ilmer Lane | £21.80 |
| Region | £/MWh |
|---|---|
| Eastern | £23.7 |
| North Western | £18.4 |
| Midlands | £17.0 |
| South Eastern | £14.9 |
| Yorkshire | £9.3 |