What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £55.33 |
| 2 | Marchwood | £33.00 |
| 3 | Rocksavage | £29.84 |
| 4 | Damhead Creek | £21.81 |
| 5 | Limejump Energy #04 | £18.60 |
| 6 | SSE Energy Supply #01 | £17.51 |
| 7 | Centrica Business Solutions S06B | £15.80 |
| Region | £/MWh |
|---|---|
| North Western | £15.1 |
| South Eastern | £11.4 |
| Eastern | £10.4 |
| Southern | £10.1 |