What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £20.38 |
| 2 | Dollymans | £11.39 |
| 3 | Rocksavage | £9.45 |
| 4 | Statkraft Markets #08 | £9.44 |
| 5 | Thame Road | £7.84 |
| 6 | Port of Tyne | £7.76 |
| 7 | F & S Energy #02 | £7.67 |
| Region | £/MWh |
|---|---|
| Eastern | £8.4 |
| Northern | £7.8 |
| Midlands | £7.0 |
| South Eastern | £7.0 |
| South Western | £6.9 |
| Southern | £6.8 |
| South Wales | £5.1 |