What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £27.79 |
| 2 | Marchwood | £20.00 |
| 3 | Unit 1 | £19.85 |
| 4 | Lakeside | £13.54 |
| 5 | SSE Energy Supply #01 | £12.75 |
| 6 | ECOTRICITY C05L | £12.47 |
| 7 | Grain | £12.18 |
| Region | £/MWh |
|---|---|
| Yorkshire | £13.5 |
| South Wales | £9.8 |
| Merseyside and North Wales | £7.1 |
| South Eastern | £5.5 |
| Southern | £5.0 |