What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate S Eng 02 | £27.94 |
| 2 | Pivot Bustleholme | £25.87 |
| 3 | Lakeside | £19.84 |
| 4 | Wormald Green | £17.77 |
| 5 | Bloxwich | £12.84 |
| 6 | Mannington | £9.71 |
| 7 | THURROCK STORAGE #1 | £7.84 |
| Region | £/MWh |
|---|---|
| Yorkshire | £19.8 |
| Northern | £17.8 |
| Midlands | £16.4 |
| Southern | £9.7 |
| South Eastern | £7.8 |