What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
| Region | £/MWh |
|---|---|
| South Wales | £9.9 |
| Yorkshire | £7.3 |
| East Midlands | £7.2 |
| Eastern | £7.2 |
| South Western | £6.4 |
| Northern | £6.1 |