What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £28.83 |
| 2 | Didcot B main 5 | £27.98 |
| 3 | Unit 3 | £27.60 |
| 4 | Keadby-2 Main | £26.50 |
| 5 | Dong Severn Ut 10 | £24.43 |
| 6 | Carrington Ltd - 1 | £24.35 |
| 7 | KGL 1 | £24.00 |
| Region | £/MWh |
|---|---|
| Eastern | £11.2 |
| South Eastern | £8.9 |
| Northern | £8.7 |
| Yorkshire | £8.6 |
| North Western | £7.9 |