What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £13.56 |
| 2 | Coryton | £13.06 |
| 3 | Swangate | £11.31 |
| 4 | Centrica Business Solutions S05L | £11.27 |
| 5 | Dong Severn Ut 20 | £11.11 |
| 6 | Sizing John | £10.32 |
| 7 | F & S Energy #03 | £10.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.3 |
| Eastern | £10.3 |
| South Eastern | £7.9 |
| North Western | £7.6 |
| Northern | £6.1 |