What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £11.81 |
| 2 | F & S Energy #03 | £9.28 |
| 3 | Tebworth Park | £9.24 |
| 4 | Unit 3 | £8.04 |
| 5 | Great Yarmouth | £7.71 |
| 6 | Pillswood 1 | £7.20 |
| 7 | Rocksavage | £6.32 |
| Region | £/MWh |
|---|---|
| South Eastern | £11.8 |
| Eastern | £9.2 |
| Yorkshire | £6.0 |
| North Western | £4.9 |
| Northern | £4.7 |