What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £16.13 |
| 2 | BMUid for Sutton Bridge | £13.96 |
| 3 | THURROCK STORAGE #3 | £13.87 |
| 4 | Didcot B main 5 | £12.42 |
| 5 | Unit 3 | £12.02 |
| 6 | F & S Energy #03 | £10.84 |
| 7 | ClayTye Farm 1 | £9.53 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.9 |
| Eastern | £9.5 |
| Yorkshire | £7.5 |
| North Western | £7.5 |