What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £6.00 |
| 2 | Chapel Farm | £5.25 |
| 3 | Dong Severn Ut 10 | £5.06 |
| 4 | Buxton | £5.00 |
| 5 | Brigg | £4.61 |
| 6 | SOUTH HUMBER BANK P/S | £4.58 |
| 7 | Carrington Ltd - 2 | £4.54 |
| Region | £/MWh |
|---|---|
| North Western | £5.0 |
| Yorkshire | £4.1 |
| Northern | £3.5 |
| Eastern | £3.5 |
| South Eastern | £3.4 |
| East Midlands | £3.3 |
| Midlands | £3.0 |
| South Western | £2.5 |