What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £15.06 |
| 2 | F & S Energy #03 | £14.28 |
| 3 | Tebworth Park | £14.16 |
| 4 | Wormald Green | £13.42 |
| 5 | THURROCK STORAGE #1 | £11.04 |
| 6 | Keadby-2 Main | £10.85 |
| 7 | Pillswood 1 | £9.95 |
| Region | £/MWh |
|---|---|
| Eastern | £14.2 |
| Northern | £13.4 |
| South Eastern | £11.0 |
| Yorkshire | £9.1 |
| North Western | £7.9 |