What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £30.09 |
| 2 | Kings Lynn A | £22.25 |
| 3 | GridBeyond L0DN | £19.69 |
| 4 | Damhead Creek | £16.35 |
| 5 | Shoreham | £16.29 |
| 6 | Carrington Ltd - 2 | £13.52 |
| 7 | Exergy Solutions E00E | £12.84 |
| Region | £/MWh |
|---|---|
| Midlands | £30.1 |
| Yorkshire | £8.5 |
| South Eastern | £7.4 |
| South Wales | £3.5 |
| South Western | £3.3 |
| Eastern | £3.0 |
| North Western | £0.0 |