What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 4 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £16.43 |
| 2 | SSE Energy Supply #01 | £13.75 |
| 3 | Clachan G1 | £9.29 |
| 4 | GridBeyond L0DN | £8.47 |
| 5 | Monk Fryston | £7.65 |
| 6 | Lakeside | £7.65 |
| 7 | Damhead Creek | £6.11 |
| Region | £/MWh |
|---|---|
| Midlands | £16.4 |
| Yorkshire | £7.6 |
| South Scotland | £4.1 |
| Eastern | £2.5 |