What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Langage | £7.00 |
| 2 | Statkraft Markets #4 | £6.54 |
| 3 | West Burton B 3 | £6.50 |
| 4 | Jamesfield 1 | £5.55 |
| 5 | Little Raith | £5.37 |
| 6 | UKPR S East | £5.17 |
| 7 | ClayTye Farm 2 | £5.11 |
| Region | £/MWh |
|---|---|
| South Scotland | £5.2 |
| North Scotland | £5.2 |
| South Eastern | £4.9 |
| Eastern | £4.7 |
| Southern | £4.3 |