What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £3.13 |
| 2 | Gerrards Cross | £2.79 |
| 3 | Swangate | £2.57 |
| 4 | Spalding | £2.30 |
| 5 | Contego | £2.23 |
| 6 | HawkersHill | £2.16 |
| 7 | Cottam Development Centre | £2.15 |
| Region | £/MWh |
|---|---|
| Yorkshire | £2.6 |
| South Eastern | £2.2 |
| Southern | £2.2 |
| Midlands | £2.1 |