What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £10.38 |
| 2 | Lakeside | £9.00 |
| 3 | Ocker Hill | £8.25 |
| 4 | Swangate | £8.11 |
| 5 | Melksham | £7.05 |
| 6 | Spalding | £6.76 |
| 7 | Buxton | £6.50 |
| Region | £/MWh |
|---|---|
| Yorkshire | £8.9 |
| Midlands | £8.3 |
| Southern | £6.6 |
| North Western | £6.5 |
| Northern | £5.1 |