What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £51.61 |
| 2 | Didcot B main 5 | £50.00 |
| 3 | Keadby-2 Main | £47.00 |
| 4 | Kings Lynn A | £45.13 |
| 5 | SOUTH HUMBER BANK P/S | £39.09 |
| 6 | KGL 1 | £39.00 |
| 7 | Exergy Solutions E00E | £38.94 |
| Region | £/MWh |
|---|---|
| North Western | £23.8 |
| Eastern | £23.8 |
| South Eastern | £23.5 |
| Midlands | £19.6 |
| South Western | £17.3 |
| Yorkshire | £17.1 |