What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £11.45 |
| 2 | Pen y Cymoedd | £3.96 |
| 3 | BREDBURY | £3.55 |
| 4 | SUNDON | £3.00 |
| 5 | Nursling | £2.25 |
| Region | £/MWh |
|---|---|
| South Western | £11.4 |
| South Wales | £4.0 |
| North Western | £3.6 |
| Eastern | £3.0 |
| Southern | £2.3 |