What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £8.51 |
| 2 | BESS Holdco 2 N03J | £8.50 |
| 3 | SUNDON | £8.30 |
| 4 | BESS Holdco 2 EN7H | £8.25 |
| 5 | Larks Green | £8.13 |
| 6 | Limejump Energy #05 | £8.09 |
| Region | £/MWh |
|---|---|
| Eastern | £8.4 |
| Southern | £8.3 |
| South Western | £8.1 |