What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Flexitricity X02N | £7.00 |
| 2 | Flexitricity #09 | £6.72 |
| 3 | Flexitricity #02 | £6.15 |
| 4 | Monk Fryston | £3.85 |
| 5 | Lakeside | £3.84 |
| 6 | Roosecote | £3.30 |
| 7 | Unit 1 | £2.82 |
| Region | £/MWh |
|---|---|
| Yorkshire | £3.8 |
| North Western | £3.3 |
| Eastern | £2.3 |