What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £7.85 |
| 2 | Drax | £7.58 |
| 3 | Sizing John | £6.15 |
| 4 | Brigg | £5.26 |
| 5 | Pen y Cymoedd | £5.25 |
| 6 | Unit 2 | £4.11 |
| 7 | Didcot B main 6 | £4.11 |
| Region | £/MWh |
|---|---|
| Eastern | £6.1 |
| Yorkshire | £5.3 |
| South Wales | £5.3 |