What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #03 | £10.95 |
| 2 | EDFE Aggregate N Scot 1 | £10.12 |
| 3 | Limejump Energy #01 | £9.91 |
| 4 | Limejump Energy #02 | £9.67 |
| 5 | Limejump Energy #02 | £9.30 |
| 6 | Limejump Energy #01 | £9.07 |
| 7 | Limejump Energy #04 | £8.02 |
| Region | £/MWh |
|---|---|
| Southern | £6.5 |
| South Eastern | £6.1 |
| Eastern | £5.9 |