What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £12.20 |
| 2 | Skelmersdale | £12.02 |
| 3 | Unit 2 | £11.86 |
| 4 | Swangate | £11.08 |
| 5 | Lakeside | £10.77 |
| 6 | BREDBURY | £10.77 |
| 7 | Pillswood 1 | £10.42 |
| Region | £/MWh |
|---|---|
| North Western | £10.8 |
| Eastern | £10.3 |
| Midlands | £10.3 |
| Yorkshire | £9.9 |
| South Eastern | £9.9 |