What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 2 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £8.81 |
| 2 | Swangate | £7.29 |
| 3 | Unit 2 | £5.63 |
| 4 | Keadby-2 Main | £4.06 |
| 5 | EDFE Aggregate S Eng 02 | £3.77 |
| 6 | Cowley | £3.58 |
| 7 | Limejump Energy #04 | £3.18 |
| Region | £/MWh |
|---|---|
| Yorkshire | £7.3 |
| South Eastern | £3.6 |
| Eastern | £2.8 |