What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £9.61 |
| 2 | EDFE Aggregate N Scot 1 | £8.25 |
| 3 | Didcot B main 6 | £8.02 |
| 4 | Didcot B main 5 | £6.43 |
| 5 | Thame Road | £6.29 |
| 6 | Seabank Module | £5.63 |
| Region | £/MWh |
|---|---|
| Eastern | £6.3 |