What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £4.53 |
| 2 | Didcot B main 6 | £4.52 |
| 3 | Seabank Module | £2.42 |
| 4 | Pivot Coventry | £2.16 |
| 5 | Cowley | £1.00 |
| Region | £/MWh |
|---|---|
| Midlands | £2.2 |
| South Eastern | £1.0 |