What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Damhead Creek | £25.67 |
| 2 | Little Barford main 1 | £25.00 |
| 3 | Limejump Energy #04 | £21.93 |
| 4 | Limejump Energy #03 | £21.34 |
| 5 | Limejump Energy #01 | £20.41 |
| 6 | Richborough Park 1 | £19.19 |
| 7 | Limejump Energy #02 | £18.74 |
| Region | £/MWh |
|---|---|
| South Eastern | £19.2 |