What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £22.59 |
| 2 | Seabank Module | £22.32 |
| 3 | GridBeyond L0DN | £21.74 |
| 4 | Limejump Energy #01 | £20.38 |
| 5 | Richborough Park 1 | £19.13 |
| 6 | Limejump Energy #02 | £18.28 |
| 7 | Carrington Ltd - 1 | £18.20 |
| Region | £/MWh |
|---|---|
| South Eastern | £19.1 |