What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 6 | £26.00 |
| 2 | Kings Lynn A | £20.88 |
| 3 | Unit 3 | £19.82 |
| 4 | GridBeyond L0DN | £19.31 |
| 5 | Carrington Ltd - 2 | £15.68 |
| 6 | SOUTH HUMBER BANK P/S | £14.62 |
| 7 | Roaring Hill | £13.00 |
| Region | £/MWh |
|---|---|
| South Scotland | £13.0 |
| South Eastern | £11.1 |
| Eastern | £8.6 |
| North Western | £7.0 |
| South Western | £6.1 |