What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £22.63 |
| 2 | Kings Lynn A | £21.00 |
| 3 | Unit 3 | £19.91 |
| 4 | GridBeyond L0DN | £19.38 |
| 5 | Spalding | £17.75 |
| 6 | Carrington Ltd - 2 | £15.59 |
| 7 | SOUTH HUMBER BANK P/S | £14.50 |
| Region | £/MWh |
|---|---|
| North Scotland | £13.4 |
| North Western | £13.0 |
| Eastern | £12.4 |
| South Scotland | £11.9 |
| Southern | £11.3 |